Baz's MK1 Restoration Page
Hello
			  I thought I'd post a few pics of my little project.  I'm keeping a diary and will add it as I go along but first I thought I'd post a few pics.  I'm going for a complete restoration of every nut, bolt and panel to try and recover this car's little lost soul. Here's a few pictures which were taken halfway through it's stripdown. Any advice and help would be much appreciated. More pics to come as well.
		    Baz

			  
			  
			  
			  
			  
			  
			  
			  
			  
WORK DIARY
	  Car was bought on 25th of May 2006 for a total of £380.  Transportation costs were about £30 for £20 trailer from Mc Carrolls and about £10 of diesel.
Day 1:  Friday 26th May
			  Car is cleared out and engine and extras all taken out of the back and car is push into the garage.  Garage gets tidied and set up ready for work to start.  Car gets it’s first general inspection.
			  Removed:
			  Rear Lights
			  Rear Seats
	  Rub Strips
Day 2:  Saturday 27th May
			  Removed:
			  Door Cards
			  Front Seats
			  Headliner
			  Rear Trim
			  Seat Belts
	  Pillar Trim
Day 3:  Tuesday 30th May
			  Removed:
			  Dash
			  Steering Wheel
			  Front Carpet
			  Soundproofing
			  Air Ducting
			  Fan
	  Instrument Cluster
Day 4:  Wednesday 31st May
	  Wiring was removed and fully labelled.  Dents and rust were also marked on bodywork with permanent marker.
Day 5:  Thursday 1st June
			  Removed:
			  Gear Linkage
			  Door Locks
			  Side Windows and seals
			  Headlights
			  Rear Wiper Motor
			  Front Bumper
			  Wing Mirrors
	  Bonnet Prop
Day 6:  Sunday 4th June
			  Removed:
			  Tailgate
	  Doors
Day 7:  Monday 5th June
			  To Do list made:
			  Remove:
			  Petrol Tank and Filler Neck
			  Fuel Lines
			  Rear Axel
			  Rear Wheels
			  Suspension
			  Brakes
			  Handbrake
			  Pedals
			  Steering
			  Front Window
	  Front Engine Mount
Clean Engine Bay
Cut Out:
			  Sills
			  Rear Panel
			  Passenger's Quarter panel
			  Hole in driver's floor
			  Hole in spare wheel well
			  Patch behind pedals
Day 8:  Saturday 10th June
			  Removed:
			  Rear axel (3 bolts out of 4 snapped off)
			  Petrol tank disconnected
			  Filler neck removed (drilled out due to corrosion)
	  Breather pipes all cut due to corrosion
Day 9: Tuesday 13th June
			  Removed:
			  Petrol Tank
			  Rear Brake Lines
	  Soundproofing on passengers floor
Dents hammered out of passenger's floor. Dents on rear strut towers hammered out. Rear hatch, upper seal groove sanded down.
Day 10:  Thursday 15th June
			  Removed:
			  Fuel and brake lines
			  Bolts from front wings
	  Front Window
Day 11:  Friday 23rd June
			  Removed:
	  Go faster stripes (stickers)
Sanded and primed rear hatch upper seal groove.
Day 12:  Saturday 24th June
			  Removed:
			  Front Wings
	  Engine bay cleaning started with degreaser.
Day 13:  Wednesday 28th June
			  Removed:
			  Fuel gauge sender unit from fuel tank
	  Continued cleaning engine bay and began removing sealer from inside front wings.
Day 14:  Monday 3rd July
	  Sanded rusted parts of front wings.  Removed more glue from inside front wings.  Began stripping sealer from inner front wings.
Day 15:  Thursday 6th July
			  Removed:
	  Drivers side suspension, wishbone, brakes, hub, wheel.
Stripped back more of drivers side inner wing.
Day 16:  Saturday 8th July
			  Removed:
	  Passenger's side suspension, brakes, wheel, hub, wishbone
Began stripping back passenger’s side inner wing. Sanded down driver’s front wing rub-strip recess. Filled recess.
Day 17:  Monday 10th July
	  Stripped and primed drivers front inner wing.  Smoothed recess in drivers wing.  Cut out hole in spare wheel well.  Cut out hole in driver's foot well, cut out rust in drivers side rear strut tower.  Filled small hole with p40.  Filled dents in rear passengers strut tower.
Day 18:  Tuesday 11th July
			  Removed:
			  Bonnet latch
			  Soundproofing from behind dash on firewall
			  All grommets from plenum chamber and firewall
			  Throttle cable
			  Accelerator pedal
			  Clutch cable and pedal
			  Ignition barrel
			  Steering lock and stalks
			  Steering rack
			  Handbrake cables
			  Rear suspension
			  Rear axel and hubs
  
	  Sanded down front part of driver's wing.  Filled and smoothed driver's wing.  Primed rub-strip recess after smoothing.  Cut out driver's outer sill.  Cut out back of driver's sill at inner rear arch.
Day 19:  Wednesday 12th July
			  Removed:
			  Brake mechanism and cylinder
	  Rear hubs taken off rear axel
Cleaned more of engine bay. Filled more dents in rear strut towers. Primed part of drivers wing. Filled dents in rear upper hatch seal recess. Sanded and primed drivers side of rear hatch seal recess.
Day 20:  Thursday 13th July
			  Removed:
			  Rear panel
			  Front Engine mount
			  Driver’s side wiper arm
	  Wiper motor and mechanism
Various dents and scratches filled and primed. Car set up on blocks. Undercoating around spare wheel well removed.
New To Do list Made:
			  Clean and prime passengers inner wing.
			  Cut all rust and prepare hole at driver's floor for repairing
			  Clean rest of engine bay
Day 21:  Saturday 29th July
			  Cleaned more of passenger's front inner wing.  Sanded and primed patch at corner of passenger front window.  Rust at back right side all cut out.  Tow hook cut out.  Finished and primed drivers rear strut tower.  Cleaned more of engine bay.
	  
Monday 31st July
	  HAND OPERATION
Monday 7th August
			  Ordered outer sills and rear outer arches.  Ophir Motors Dundrod - Hadrian panel distributor.  Collected on Thursday 10th.
Day 22:  Friday 29th September
	  Sanded and smoothed drivers wing - also added a coat of primer.
Day 23:  Wednesday 4th October
	  Sanded front window surround and primed.  Tidied Shed. Filled and smoothed hole in bottom of passenger’s wing.
Mother in hospital
Wednesday 8th November - Rear panel arrived from crazy quiff.
Day 24:  Wednesday 15th November
	  Sanded and primed front half of passenger’s inner wing.  Cut out badly welded patch on firewall behind clutch.  Cut out driver's side of rain tray.
Day 25:  Thursday 16th November
	  Removed rest of rain tray.
Day 26:  Sunday 31st December (New Years Eve)
	  Cut out both rotten arches.  Cut out passenger's sill.
